| Parts Required |
1 Barrel lock assembly
a)Lock barrel and tumbler
b)Latch
c)Lock Nut
d)Screw
1 5 1/2 x 3 black plastic
fill with slot
1 Retainer plate
1 Aluminum bar
3 SS clips
4 Black pop rivets
1 Rivnut and screws
6 #6 x 1/2 pan head screw
1 Screw and latch assembly |
Required Tools |
* Drewel tool or sharp knife
* 3/4" hole saw
* Pop rivet tool
* 7/8" deep well socket
* Tape measure
* Phillips screw driver
* Slot screw driver
* #32 drill bit |
Installation |
Step 1 |
| Use tape measure and mark a center line at 34 3/4" from the top of the cabinet on the left end. Mark second center line 7/8" from outside edge. This should center the hole in the end of the cabinet. |
Step 2 |
| Use 3/4" hole saw and drill hole on center line. |
Step 3 |
| Remove door jam gasket for left door jam. |
Step 4 |
| Draw center line on black plastic fill in. Align fill in center line with cabinet center line and mark a line along top and bottom to fill in. |
|
Step 5 |
| Using drewel tool or sharp knife, cut out black plastic breaker on marked lines. Remove this section of breaker completely. Some of the aluminum wall will need to be removed to create a large enough compartment to work in. |
Step 6 |
| Once the breaker is removed, now the foam can be dug out and form the lock box. Only enough foam should be removed to install lock. |
Step 7 |
| Install lock assembly through 3/4" hole. Place retainer plate and lock nut end, tighten with 7/8" socket. Install tumbler and latch assembly and tighten screw. |
Step 8 |
| Install black plastic fill in plate working lock to make sure latch will move through the slot. When components operate properly, fasten fill in with black pop rivets. |
REMINDER |
| Remember to install left door gasket |
Step 9 |
| With left door installed, mark rear of door where the notch in the latch meet the door frame. Drill a #32 hole on the mark. Install screw and latch tube assembly into drilled hole. Latch should drop onto tube assembly and lock left door. |
|
Step 10 |
| Install lock bar assembly to rear edge of right door. Install so the bar is 2" from the top of the door in the storage position (use #32 drill bit). |
Step 11 |
| Lower bar into locking position. It should be positioned against 3" breaker strip. Install third SS clip so locking bar will fall into it as a pocket. This will hold bar in the locking position (use #32 drill bit). |
 |
 |
|